First the rear baffle and rear rib flanges were cleaned with MEK. Then a bead of proseal was applied, in all of the appropriate places, and the baffle was dropped in place. Next the holes were clecoed up 100%. We then sealed and clecoed the Z brackets in place, followed by riveting.
Here you can see the tank Z brackets and rear baffle flanges riveted and sealed in place.
No comments:
Post a Comment