The following is a brief and simple description of my construction of a Vans RV8 aircraft. Scroll down to the labels for a complete log of each section. Enjoy!
-JT
*This blog is for entertainment purposes only* *DREAM IT, BUILD IT, FLY IT*
Tuesday, August 17, 2010
Control Cables Pulled and Connected
I used control cable eyeballs here.
The throttle connection and linkage on my forward facing induction.
Mixture connection and linkage. Lots of tweaking to get the throws set correctly.
No comments:
Post a Comment