Friday, November 21, 2008

Empennage Attachment Pt.1

Here the Horizontal Stabilizer has been temporaily bolted in place and the Vert Stab has been squared.
We are celebrating the mounting of the Tail. Harray!





Horizontal Stab all drilled,deburred, and temp bolted in place. It was squared and leveled to 0.0 degrees, (Dead On, No kiding), with my digital level. I was very pleased with everything .


I spent hours checking and rechecking everything as I drilled each attachment bolt hole..

No comments: