The following is a brief and simple description of my construction of a Vans RV8 aircraft. Scroll down to the labels for a complete log of each section. Enjoy!
-JT
*This blog is for entertainment purposes only* *DREAM IT, BUILD IT, FLY IT*
Thursday, June 05, 2008
Forward Fuselage Structure Pt.1
Lower Left Lower Longeron clamped in place and ready to be drilled out. Sorry for the blurry pic. Aux Longeron and gussets in place for a test fit.
No comments:
Post a Comment