I clecoed the leading edge support bracket(previously fabricated and primed) and inside rib support in place.
I drilled out the hole for the flop tube AN fitting. I started with smaller bits and finished off the hole with a unibit.
I connected the flop tube for a test fit.
I drilled out the vent and vapor return line holes, in right inboard rib.
No comments:
Post a Comment