Wednesday, September 19, 2007
Left Leading Edge Assembly Complete
I finished the LE assembly by squeezing 426 flush rivets along the top and bottom aft edge. Watch out for the rivet call outs.
*Note- When riveting here, be careful not to let the rivet flip the main rib flanges up. Use clamps, clecos, etc. to help prevent this from happening. You want the flanges to be snug against the main spar.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment