The following is a brief and simple description of my construction of a Vans RV8 aircraft. Scroll down to the labels for a complete log of each section. Enjoy!
-JT
*This blog is for entertainment purposes only* *DREAM IT, BUILD IT, FLY IT*
Sunday, January 24, 2010
Flap Motor Installed!
The flap motor. I wired everything up and tested the motor with the flap switch on the panel. The motor and the wiring will be covered up by the aft panel, not shown.
No comments:
Post a Comment